Dhaka Airport’s long-awaited third terminal is 97% complete, with a second runway in planning
During an inspection of the ongoing construction on May 30, the minister announced that the 3rd terminal is set to...
During an inspection of the ongoing construction on May 30, the minister announced that the 3rd terminal is set to...